Unit Coming Vacant in MD, DC or VA? Call (240) 695-4415 to Confirm Availability★Unit Coming Vacant in MD, DC or VA? Call (240) 695-4415 to Confirm Availability★Unit Coming Vacant in MD, DC or VA? Call (240) 695-4415 to Confirm Availability★Unit Coming Vacant in MD, DC or VA? Call (240) 695-4415 to Confirm Availability★

Comparison

Make-Ready vs. Full Turnover: Which Does Your Unit Need?

By All Purpose Anytime Services LLC

Most property managers call everything a make-ready. That is how a unit with three damaged walls ends up priced like a touch-up, and then the invoice changes. The difference is simple once you name it.

The one-line difference

Make-ready is cosmetic work on a unit that is basically sound: touch-up paint, a few hardware items, a caulk line. A full turnover repairs damage first, then does the cosmetic work on top of it.

Signs the unit needs a full turnover

  • Holes in more than one or two walls
  • Doors that are broken, not just sticking
  • Flooring that is damaged, not just dirty
  • Stains on the ceiling
  • A full repaint because touch-ups would flash

Signs make-ready is enough

  • Walls take touch-up paint and blend
  • Every door closes and latches
  • Floors are clean and intact
  • The list is mostly hardware, caulk and small items

Why naming it matters

A make-ready price on a turnover unit is how change orders happen. Our written scope says which one the unit is, so the price you approve is the price of the work the unit actually needs.

Costs for each: make-ready cost per unit and apartment turnover cost.