Skip to main content

Permits by Project

Do You Need a Permit for Kitchen remodel that moves plumbing, gas or electrical?

Of the 10 areas we checked, a permit is required in 10.

Washington, DC

Washington, DC

Permit required
When it applies
alteration of existing building; MEP changes
Permits
Building, Electrical, Plumbing, Mechanical, Gas
Notes
DOB: 'Additions, alterations, or repair of existing buildings' require permits. Instant trade permits may cover qualifying scopes.

Source: DOB How to Get a Permit, checked 2026-10-07

Maryland

Anne Arundel County, MD

Permit required
When it applies
construction/renovation incl. wall or MEP changes
Permits
Building, Electrical, Plumbing, Mechanical
Who pulls it
A licensed contractor
Notes
Residential Alteration permit; trade permits are separate applications — none issued automatically with the building permit. Electrical/gas applicants must hold county licenses (Code 105.3.2/105.3.3).

Source: I&P Do I need a Permit?, checked 2026-10-07

Charles County, MD

Permit required
When it applies
alteration + MEP system work
Permits
Building, Electrical, Plumbing, Mechanical, Gas
Notes
Building permit under adopted codes; plumbing/gas, mechanical, electrical trade permits per county fee schedule.

Source: Charles County Code Ch. 224; PGM FY2027 Fees & Charges, checked 2026-10-07

Montgomery County, MD

Permit required
When it applies
reconstruction/renovation beyond repair; MEP alterations
Permits
Building, Electrical, Plumbing, Gas
Who pulls it
A licensed contractor
Faster route
Electrical permit auto-issued via DPS ePermits
Notes
DPS: permit required for 'reconstruction or renovation... other than a repair.' Electrical applicant must hold MD master electrician license; WSSC licenses plumbers/gasfitters.

Source: DPS Residential Alterations Permit Process, checked 2026-10-07

Prince George's County, MD

Permit required
When it applies
moving plumbing/gas/electrical or partitions
Permits
Building, Electrical, Plumbing, Gas
Who pulls it
A licensed contractor
Notes
'Put up partitions and finish rec room (electric/plumbing, separate permits required) B Y.' Electrical by Master Electrician licensed with PG County; plumbing/gas by WSSC-licensed master plumber/gasfitter.

Source: DPIE Homeowner's Guide to Permits, checked 2026-10-07

Northern Virginia

Arlington County, VA

Permit required
When it applies
USBC 108.1: wall/partition changes; water/drainage/vent, electric wiring, mechanical/fuel systems
Permits
Building, Electrical, Plumbing, Mechanical, Gas
Notes
Apply via Permit Arlington; USBC 108.4 requires contractor licensure proof or exemption statement.

Source: USBC 13VAC5-63-80 Section 108, checked 2026-10-07

City of Alexandria, VA

Permit required
When it applies
alteration + MEP changes
Permits
Building, Electrical, Plumbing, Mechanical, Gas
Faster route
Walk-Thru Plan Review (1&2 family kitchen alterations)

Source: Alexandria Permit Center plan review programs, checked 2026-10-07

Fairfax County, VA

Permit required
When it applies
structural/MEP alteration
Permits
Building, Electrical, Plumbing, Mechanical, Gas
Notes
LDS: owners may pull permits but licensed contractor strongly recommended.

Source: LDS Permit Library: Residential Building, checked 2026-10-07

Loudoun County, VA

Permit required
When it applies
alteration + trade work
Permits
Building, Electrical, Plumbing, Mechanical, Gas
Faster route
LandMARC online
Notes
Residential trade permits required; gas permits for alterations/additions need plans review.

Source: Loudoun Residential Additions and Alterations, checked 2026-10-07

Prince William County, VA

Permit required
When it applies
'alterations to the house plumbing, electrical, or heating and air conditioning (mechanical) systems' — always required
Permits
Building, Electrical, Plumbing, Mechanical, Gas
Faster route
ePortal online

Source: PWC Do I Need a Permit?, checked 2026-10-07

Summarized from each area’s official permit pages and codes, as of October 2026. Some Maryland municipalities issue their own permits, rules change, and many answers depend on the exact scope, so confirm with the permit office before work starts. This is general information, not legal advice.

Planning a Turnover?

Set the budget from the rent with the planner, then book a walkthrough.